This video shows a 7.5 ton grab bucket overhead crane kit supplied for garbage handling in Indonesia. The project includes 3 sets of grab overhead cranes for lifting, transferring and feeding waste in a garbage handling facility.
The 7.5 ton grab bucket crane is designed for repetitive bulk waste handling. The crane uses an overhead bridge structure, electric grab bucket and lifting mechanism to pick up garbage from the waste storage pit and discharge it into the required hopper, feeding system or processing equipment.
For waste handling applications, the crane and grab bucket are selected according to garbage density, grab volume, lifting capacity, lifting height, crane span, working cycle and required throughput. The actual load can vary significantly depending on the type and moisture content of the waste.
Yuantai engineers can supply the complete overhead crane kit, grab bucket, hoisting system, travelling mechanism, electrical control system and commissioning service according to the customer's waste handling plant layout.
| Item | Technical Specification |
|---|---|
| Crane type | 7.5 Ton Grab Bucket Overhead Crane / Grab Overhead Crane Kit |
| Project quantity | 3 sets |
| Application | Garbage handling, waste transfer, waste feeding and refuse handling |
| Project location | Indonesia |
| Rated capacity | 7.5 ton, customized according to the maximum lifted load |
| Crane structure | Double girder overhead bridge crane |
| Grab bucket | Electric grab bucket / customized waste handling grab |
| Grab bucket volume | Customized according to garbage density and required throughput |
| Span | Customized according to waste pit or plant building layout |
| Lifting height | Customized according to waste pit depth and discharge height |
| Hoisting system | Electric wire rope hoist / open winch grab trolley |
| Hoisting speed | 3 – 12 m/min, customized according to working cycle |
| Trolley speed | 20 – 40 m/min, VFD available |
| Crane travelling speed | 20 – 40 m/min, customized |
| Duty class | ISO A6 – A8 / FEM 3M – 5M, according to operating frequency |
| Control | Operator Cabin / Radio Remote / PLC Control |
| Automation | Semi-automatic or automatic grab positioning and feeding functions available |
| Power supply | 380V / 50Hz / 3Ph standard; customized according to Indonesia site requirements |
| Safety devices | Overload limiter, lifting limit switches, travel limit switches, emergency stop, buffers and warning alarms |
| Commissioning | On-site installation and commissioning support available |
| Yuantai Crane engineering | The crane, grab bucket, electrical system, travelling mechanism and commissioning requirements are considered as one complete waste handling system. |
A grab bucket overhead crane for garbage handling uses a motorized grab to pick up waste from a storage pit or unloading area. The loaded grab is then lifted and moved by the crane to the required hopper, waste feeder, furnace or processing line.
After reaching the discharge position, the grab opens and releases the garbage. The empty grab then returns to the waste pit for the next handling cycle.
This repetitive lifting process makes the 7.5 ton grab crane suitable for waste transfer stations, municipal solid waste facilities, refuse handling plants and waste-to-energy applications.
A garbage handling overhead crane is commonly used above waste storage pits where large quantities of refuse must be moved continuously. The grab bucket allows the crane to handle loose and irregular waste without slings or pallets.
A grab bucket overhead crane is well suited to garbage handling because the grab can directly collect loose waste from a storage pit and discharge it at the required location.
The overhead crane arrangement also keeps the lifting equipment above the waste pit, allowing the crane to cover a large working area while supporting repetitive waste transfer and feeding operations.
For a high-throughput facility, the crane can be designed for frequent grab cycles and coordinated with the waste feeding process.
This project involves 3 sets of 7.5 ton grab bucket overhead cranes for garbage handling in Indonesia. Supplying multiple cranes requires consistent equipment configuration, electrical coordination and commissioning procedures across the complete project.
Yuantai can coordinate the crane structure, grab bucket, hoisting mechanism, travelling system, electrical control and commissioning for multiple crane sets according to the plant layout and operating sequence.
For a garbage handling crane project, installation and commissioning are important parts of the complete supply scope. The crane must be checked after installation before entering regular waste handling operation.
Yuantai engineers design the grab bucket overhead crane around the actual waste handling process and plant layout.
This engineering approach helps match the 7.5 ton grab crane with the required waste handling capacity, working cycle and facility layout.
Common questions about grab overhead cranes, garbage handling cranes, waste pit cranes, crane kits and commissioning for waste handling plants.
A 7.5 ton grab bucket overhead crane is an overhead bridge crane equipped with a grab bucket for lifting and transferring loose garbage and other bulk waste materials.
It is commonly used in waste handling plants, garbage storage pits, transfer stations and waste-to-energy facilities.
Yes. A grab overhead crane can handle loose municipal solid waste, provided the grab bucket, crane capacity and duty class are selected according to the actual waste characteristics.
Waste density and moisture content should be considered when determining the maximum lifted load.
A grab bucket can directly collect loose waste from a storage pit without using slings, pallets or manual loading equipment.
The grab can then discharge the waste into a hopper, feeder, furnace or other processing system.
Provide the waste type, approximate density, required grab volume, crane capacity, span, lifting height, waste pit dimensions, working frequency and discharge position.
A plant layout showing the waste pit, hopper and feeding equipment helps Yuantai engineers determine the required crane working envelope.
The duty class depends on the number of grab cycles, operating hours, lifting frequency and required service life.
Yuantai engineers select the appropriate ISO/FEM duty classification according to the actual waste handling schedule rather than applying the same class to every project.
Yes. Multiple 7.5 ton grab overhead cranes can be engineered and supplied as a coordinated project, including crane equipment, grab buckets, electrical systems and commissioning support.
For a three-crane project, consistent equipment configuration and coordinated commissioning help simplify installation, operation and maintenance.
Yuantai Crane has engineering and manufacturing experience with grab bucket overhead cranes, double girder overhead cranes, bulk material handling cranes and waste handling lifting systems.
For garbage handling projects, Yuantai engineers review the crane bridge, grab bucket, hoisting system, travelling mechanism, control system, waste characteristics, working cycle and plant layout together before finalizing the crane configuration.
Send us your waste type, waste density, grab bucket volume, 7.5 ton lifting capacity, span, lifting height, working frequency, waste pit dimensions and plant layout.
Yuantai Crane can provide a complete 7.5 ton grab bucket overhead crane kit, including crane equipment, grab bucket, electrical control and commissioning support for garbage handling and waste-to-energy applications in Indonesia and other markets.
Yuantai Cranes - Global Material Handling Crane Solution Provider & Manufacturer with CE, ISO, SGS, CNEX and other Third Party Certifications.
Get Your Custom Quote – Quick & Easy
Fill in what you know. Skip what you don't – we'll help.
Just leave a message via the contact form and our hoist and crane engineer will contact you with in 24working hours.
Inquire Yuantai Cranes