Project Overview
In 2024, we delivered 3 sets of 7.5 Ton Grab Bucket Overhead Crane Kits for garbage handling in Indonesia. The cranes are specially designed for waste management operations, featuring a 7.5-ton capacity and a grab bucket to lift and move bulk garbage materials effectively. This project aims to support the customer's need for heavy-duty equipment to improve waste handling efficiency.
The customer's primary goal was to improve waste collection and disposal efficiency, ensuring smoother and quicker operations at the site.
Detailed technical overview, specifications, design features, applications, and advantages of the QZ Grab Bucket Overhead Crane Kit without a main girder.
grab bucket overhead crane for your reference
The QZ Grab Bucket Overhead Crane Kit without a Main Girder is a specialized crane designed for efficient handling of bulk materials, specifically tailored for waste management or other industries dealing with heavy, irregular loads. This crane features an innovative design with no main girder, which helps maximize space and improve maneuverability in tight or restricted areas. It is capable of handling loads up to 6.3 tons.
Capacity: 6.3 tons. The crane is designed to handle loads of up to 6.3 tons, making it suitable for medium-heavy applications where large volumes of materials need to be moved efficiently, such as handling waste or scrap metal.
Span: 24 meters. With a 24-meter span, the crane is able to cover a significant area within the workshop or site, making it ideal for large-scale operations where the movement of heavy loads across a wide area is required.
Height: 17 meters. The 17-meter lifting height ensures the crane can handle lifting and lowering tasks that involve substantial height, making it suitable for operations that require clearance over tall containers or for reaching higher storage bins.
The no main girder design refers to the crane's structure, which eliminates the need for a traditional girder system. This design offers several advantages.
This crane is equipped with a grab bucket, which is designed to efficiently collect and lift bulk materials. The grab bucket allows for precise material handling, especially when dealing with irregularly shaped or loose materials like waste, garbage, and scrap. The bucket can be controlled to open and close, ensuring materials can be lifted and moved without spillage or damage.
The QZ Grab Bucket Overhead Crane without a main girder is specifically suited for industries that require heavy-duty material handling but have spatial constraints. It is widely used in:
The QZ Grab Bucket Overhead Crane Kit is a versatile, efficient, and space-saving solution for handling bulk materials in industries such as waste management and scrap recycling, providing customers with a reliable tool for heavy-duty material transport.
Production Timeline and Key Milestones
Challenges and Solutions
Slow Production of Small Crane and Brake Components
During the production process, small crane parts and brakes faced delays in manufacturing, which slowed down the assembly of the overhead crane kit. These components were essential for the crane's performance, but their late production created a slight bottleneck.
Solution: To resolve this, we coordinated closely with suppliers to expedite production. Adjustments were made in other areas of the assembly line to ensure the project kept moving forward without further delays.
Timely Shipment of Critical Components (SEW Hoists and Motors)
The SEW hoists and motors were crucial for the functionality of the grab bucket crane kits, and there were concerns about their timely arrival. Any delay in receiving these key components could have impacted the entire production timeline.
Solution: To mitigate this risk, the logistics team ensured that the hoists and motors were shipped ahead of schedule. Close communication with suppliers allowed for the timely arrival of these critical parts, ensuring the crane kit assembly continued as planned.
The production of the Grab Bucket Overhead Crane Kits involved overcoming some challenges, but through effective planning and communication, the team was able to stay on track. Despite delays in smaller components, the project remained on schedule, and all critical parts were delivered and assembled on time.
Shipment and Final Preparations
Before shipment, careful preparation was made to ensure that all necessary components, including after-sales parts, were included. This included:
These parts were carefully packed and included in the shipment to ensure that the customer had everything needed for both immediate use and future maintenance.
Delivery and Installation in Indonesia
Expected Delivery Date: The cranes were scheduled for delivery to Indonesia on October 11, 2024. This date was set to ensure that the customer would receive the overhead crane kits in a timely manner, allowing for efficient installation and commissioning.
Coordination with the Client for Installation and Final Commissioning: After the delivery, our team worked closely with the client to coordinate the installation and final commissioning of the Grab Bucket Overhead Crane Kits. This included:
The final step of the installation process was to perform a full inspection and handover, ensuring the cranes were ready to start operating and meet the demands of the customer's waste management facility. Through careful coordination, we made sure the cranes were up and running as planned.
Open winch trolly and trolley frame
end carriages and main parts
An overview of efficiency, reliability, durability, and operational advantages delivered by the grab bucket overhead crane in waste management applications.
The 7.5 Ton Grab Bucket Overhead Crane is specifically designed to enhance the efficiency of garbage handling. The key features that contribute to its effectiveness include:
These factors combine to create a more productive waste management system, reducing downtime and improving the overall workflow at the facility.
The Grab Bucket Overhead Crane is built to withstand the heavy-duty demands of continuous use in a waste management environment. The crane's construction and components are designed for:
This durability ensures the crane provides consistent performance, even in demanding, high-volume waste handling operations.
The 7.5 Ton Grab Bucket Overhead Crane offers several operational benefits, making waste management more efficient:
These operational benefits not only improve the efficiency of waste handling but also enhance the overall effectiveness of the waste management process, reducing costs and improving throughput. The crane's design and capabilities allow for a smoother, more reliable waste collection and disposal system.
Comprehensive after-sales parts supply, customer support services, and warranty coverage to ensure long-term crane performance and reliability.
To ensure the long-term performance and reliability of the Grab Bucket Overhead Crane, several after-sales parts were included as part of the delivery. These parts are essential for maintenance and continued efficient operation:
These after-sales parts are essential to maintaining the crane's longevity and efficiency, providing the customer with everything needed for routine upkeep and repairs.
Ongoing Support and Maintenance: After installation, our team continues to provide ongoing support to ensure the crane operates smoothly. We offer:
Our customer support is always available to assist with any issues or questions that arise after installation, ensuring the crane continues to meet operational needs effectively.
Warranty Terms: The cranes and components come with a comprehensive warranty, covering both parts and labor for a specified period. This warranty ensures that any defects in materials or workmanship are addressed promptly without additional cost to the customer.
It provides peace of mind, knowing that if any issues arise during the warranty period, they will be resolved quickly and efficiently.
The combination of quality after-sales parts and responsive customer support ensures that the Grab Bucket Overhead Crane continues to deliver reliable performance long after installation. The warranty further adds to the assurance that the customer is backed by a professional team ready to address any concerns promptly.
The supply and installation of the 7.5 Ton Grab Bucket Overhead Crane Kits in Indonesia was a resounding success. The cranes were delivered on time and installed with precision, meeting the client's needs for efficient and heavy-duty waste handling. The cranes, with their robust design and specialized features, have proven to be effective in streamlining the waste management process, demonstrating their value in real-world operations.
Customer Satisfaction
The client has expressed positive feedback regarding the performance and efficiency of the Grab Bucket Overhead Cranes. They highlighted the cranes' ability to handle large volumes of waste quickly and efficiently, significantly improving their operations. The cranes' reliable performance and user-friendly features have ensured a smooth integration into the customer's waste management system. The client is satisfied with the overall quality, performance, and after-sales support provided.
Future Prospects
Given the success of this project, there is a strong potential for future orders. The client's satisfaction with the current installation positions us well for additional business opportunities, whether it's for more Grab Bucket Overhead Crane Kits or other related equipment for their expanding waste management needs. Based on the success of this project, we look forward to continuing our partnership with the client and exploring opportunities for further collaboration in the future.